When we think about constructing a new house, probably one question will hit our minds that what would be the cost of construction. This common question arises in our minds when we decide to build a new home. To know […]
Rate Analysis of Excavation in Earthwork: September 2023
Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation to be carried out, the cost of […]
Rate Analysis of Brick Masonry : September 2023
Introduction of Rate Analysis of Brick Masonry Rate analysis of brick masonry used of reference book IS Code 1200 part 3(IS Code 1200 part 3 used for measurement), IS Code 2212, and CPWD Part 1. All calculations of brick masonry […]
What is Rate Analysis | Rate Analysis of Earth Work, Brick, Concrete and Plaster: September 2023
What is Rate Analysis? The basis of arriving at a correct and reasonable rate per unit. Work or supply for a particular item following its specification and detailed survey of materials, labour, equipment, etc. as required for the unit work, […]
Rate Analysis of RCC (Reinforcement Cement Concrete): September 2023
Rate analysis of RCC (Reinforcement Cement Concrete) used for reference book IS Code 1200 part 2 (IS Code 1200 part 2 used for measurement), IS Code 2212, and CPWD Part 1. All calculations of Reinforcement Cement Concrete for rate analysis. […]