What Is Falsework | Types of Falsework |Causes of Falsework Failures

Falsework Means

What Is Falsework?

Read more

Types of Falsework

Shorbrace System

Read more
  • Shorbrace Frame
  • Shorebrace Telescopic Frame
  • Vertical Frame Connector
  • U Head Jack
  • Cross Bracing
  • Shorbrace Frame
Read more

Shorebrace Telescopic Frame

Vertical Frame Connector

Read more

U Head Jack

Cross Bracing

Read more

Cup-Lock Supporting System

  • Post-Head Jack
  • U and Post Head Jack
  • Spigot Connector
  • Ledgers
Read more

Post-Head Jack

U and Post Head Jack

Read more

Spigot Connector

Ledgers

Read more

Causes of Falsework Failures

Number of OccurrencesSymbolCauses of failure
a. Triggering causes of failure
3aHeavy rain causing falsework foundation slippage
1bStrong river current causing falsework foundation slippage
1cStrong winds
4dFire
5eFailure of equipment for moving formwork
4fEffects of formwork component failure
1gConcentrated load due to improper prestressing operation
2hΒ Concentrated load due to construction material
2iOther imposed loads
27jΒ Impact loads from concrete debris and other effects during concreting
3kImpact load from construction equipment/vehicles
5lVibration from nearby equipment/vehicles or excavation work
6mEffect of improper/premature falsework or formwork removal
20nOther causes or not available
b. Enabling causes of failure
17AInadequate falsework cross- bracing/lacing
14BInadequate falsework component
9CInadequate falsework connection
7DInadequate falsework foundation
8EInadequate falsework design
4FInsufficient number of shoring
1GInadequate reshoring
4HFailure of movable falsework/formwork components
2IImproper installation/maintenance of construction equipment
1JFailure of permanent structure component
4KInadequate soil foundation
2LInadequate design/construction of a permanent structure
30SOther causes or not available
C. Procedural causes of failure
23MInadequate review of falsework design/construction
22NLack of inspection of falsework/formwork during concreting
2OImproper concrete test prior to removing falsework /formwork
4PEmployment of inexperienced/inadequately trained workmen
1QInadequate communication between parties involved
5RChange of falsework design concept during construction
38TOther causes or not available
Read more

Falseworks

  • Foundation Failures
  • Road Development Plans in India
  • What Does Parapet Mean | Types of Parapet Wall | Uses of Parapet Wall
  • What Is Dry Pack Mortar | Advantages of Dry Pack Mortar | Disadvantages of Dry Pack Mortar
  • What Is Caisson Foundation | Types of Caisson Foundation | Advantage, Disadvantage, Application, & Construction of Caisson
  • What Is Hempcrete | Hempcrete Blocks | Advantages & Disadvantages of Hempcrete Blocks | Applications of Hempcrete
  • What Is Hard Hat | Hard Hat Colour Definition | Different Hard Hat Colour Codes | Types of Safety Helmets | Classification of Hard Hats
Read more

Did you like this story?

Please share by clicking this button!

Visit our site and see all other available articles!

CivilJungle