Rate Analysis of Excavation in Earthwork: June 2023
Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation…
Rate analysis of excavation in earthwork use of IS Code 1200 part 1, Part 27, IS 4988, IS 12138 (Part IV) and CPWD for calculation is this measurement of the quantity of excavation…
Introduction of Rate Analysis of Brick Masonry Rate analysis of brick masonry used of reference book IS Code 1200 part 3(IS Code 1200 part 3 used for measurement), IS Code 2212, and CPWD…
What is Rate Analysis? The basis of arriving at a correct and reasonable rate per unit. Work or supply for a particular item following its specification and detailed survey of materials, labour, equipment,…
Rate analysis of RCC (Reinforcement Cement Concrete) used for reference book IS Code 1200 part 2 (IS Code 1200 part 2 used for measurement), IS Code 2212, and CPWD Part 1. All calculations…
What Is Contour Interval? A contour interval is a vertical distance or difference in elevation between contour lines. Index contours are bold or thicker lines that appear at every fifth contour line. or…
What Is Carpet Area? Carpet area is the area that can actually be covered by a carpet or the area of the apartment, excluding the thickness of the inner walls. The carpet area…